Bespoke Temporary Works Design Service

Here at Pro-Shore we offer a full temporary works design service, this initial FREE of charge service enables our clients to have the confidence in using Pro-Shore for all their shoring requirements. Our experienced qualified engineers can provide a temporary works design for all manner of differing applications. Whether this is a complex basement scheme or a shallow utility trench, Pro-Shore have the knowledge and experience to provide a safe and cost effective solution. When timing is critical, Pro-Shore can deliver a quick solution without compromising any of their standards. Working always to comply to CDM Regulations and BS5975 Pro-Shore delivers time and time again.

Download the below Design Request Form, complete the form and return it to us here at Pro-Shore. If you need assistance with this process, please contact us and speak to one of the regional sales managers.

Standard Engineered Solutions

In the ever changing Shoring Industry Pro-Shore have pioneered an effective way of providing a simple safe temporary works solution. This is what is referred to as a “standard solution,” this is not meant as a replacement to a Bespoke design but where a standard simple straight forward solution is needed this procures an off the shelf temporary works design. In the example provided there are standard characteristics of the soil and dimensions thus allowing the standard solution to be adopted. If the criteria is not met then site should then look to the Bespoke service, however in a lot of instances the standard solution can be used successfully.

Our People

WHY US

Very competitive hire rates

Excellent range of shoring equipment

Experienced and knowledgeable staff

Short term hire or long term hire deals

Fast turnaround on shoring equipment hire

Flexible hire terms

Short notice delivery and pick up

Realistic approach to shoring equipment damage

Proud to be working with

Contact Us

If you need assistance with this process, please Fill the form or
Contact us

    Or Call: 0845 003 8984

    Latest News

    November 8, 2023
    See here a third-party article written about Pro Shore and how we stand out amongst our competitors within the shoring industry.
    February 7, 2023
    Here's a recent scheme we have had the pleasure of supplying, for a valued customer in 2023.
    December 1, 2022
    Here’s a quick look at our Proshore i600 hydraulic frames being utilised for a tank installation in Liverpool Docks alongside 7m L605 sheet piles to assure no water ingress within the workspace.
    November 25, 2022
    The AWARD WINNING Pipe Pusher was developed to ensure Safer Jointing of a pipeline during installation but also has the added benefit of making it Quicker and Easier too.
    February 2, 2022
    Here's a new scheme in Southport for a large culvert installation to kick off 2022.
    August 22, 2019
    With future expansion plans, re-investment is key to Pro-Shore’s growth ambitions. We are continually investing in...