Manhole Shutters

product

Manhole Shutters

Manhole shutters are designed to provide a quick and effective method of constructing circular formwork. Pro-Shore manhole shutters can be used primarily to create a uniform concrete surround around pre cast concrete manhole rings with differing panel sizes for different diameters joined together with a pin and wedge assembly system for ease of use.

About Pro-Shore Manhole Shutters

  • 3 Differing Panel Sizes for ease of construction
  • Captive Pin and Wedge System
  • Lifting points on all sizes
  • One standard height of 1800mm

“X” Nominal Internal Diameter of Manhole (mm)

“Y” Thickness (mm) Number Of Sections Req’ “Z” External Diameter of Concrete (mm) Theoretical Thickness of Concrete (mm) Volume of Concrete Surround (m3)
A B C
675 65 2 1 0 1171 183 1.02
900 75 2 2 0 1368 159 1.09
1050 85 3 0 1 1541 160 1.25
1200 100 3 1 1 1738 169 1.5
1350 112 3 2 0 1855 141 1.36
1500 115 4 0 1 2028 150 1.58
1800 115 4 2 0 2342 156 1.93
2100 120 5 1 1 2712 186 2.66
2400 135 6 0 1 3002 166 2.66
2700 162 6 2 1 3396 186 3.38
3000 210 7 2 0 3800 190 3.89

WHY US

Very competitive hire rates

Excellent range of shoring equipment

Experienced and knowledgeable staff

Short term hire or long term hire deals

Fast turnaround on shoring equipment hire

Flexible hire terms

Short notice delivery and pick up

Realistic approach to shoring equipment damage

Proud to be working with

Brochure

Pro Shore was founded in 2007 as a realistic alternative to using larger national companies. We provide excavation support safety equipment throughout Northern England. We can and have supplied further afield when required.

brochure
req-bg

Download the below Design Request Form, complete the form and return it to us here at Pro Shore

If you need assistance with this process, please contact us and speak to one of the regional sales managers.

Testimonials

If you need assistance with this process, please Fill the form or
Contact us

    Or Call: 0845 003 8984

    Latest News

    November 8, 2023
    See here a third-party article written about Pro Shore and how we stand out amongst our competitors within the shoring industry.
    February 7, 2023
    Here's a recent scheme we have had the pleasure of supplying, for a valued customer in 2023.
    December 1, 2022
    Here’s a quick look at our Proshore i600 hydraulic frames being utilised for a tank installation in Liverpool Docks alongside 7m L605 sheet piles to assure no water ingress within the workspace.
    November 25, 2022
    The AWARD WINNING Pipe Pusher was developed to ensure Safer Jointing of a pipeline during installation but also has the added benefit of making it Quicker and Easier too.
    February 2, 2022
    Here's a new scheme in Southport for a large culvert installation to kick off 2022.
    August 22, 2019
    With future expansion plans, re-investment is key to Pro-Shore’s growth ambitions. We are continually investing in...