i600 Hydraulic Bracing System

product

i600 Hydraulic Bracing System

The Pro-Shore i600 Hydraulic Bracing is for when a durable, heavy duty solution is required for a deep excavation. It is highly versatile and easy to use with its flexible two-pin connection system which can enable you to carry out the excavation with minimal labour.

Allows for the “SAFE” and “QUICK”  installation of underground structures. Ranging from Carlow Tanks, Wet Wells, Pumping Chamber

  • Modular format allows for easy installation of large frame configurations with relatively light duty lifting equipment.
  • Single Pinned joint in the corner’s connections for quick assembly on site.
  • Ideal for long excavations, where large clear spans are required.
  • In built corner joint articulation enables the legs to be used for non-rectangular e.g. hexagonal excavations.
  • Double acting hydraulics with integral mechanical lock off valve for ease of installation and removal with zero fluid loss.

WHY US

Very competitive hire rates

Excellent range of shoring equipment

Experienced and knowledgeable staff

Short term hire or long term hire deals

Fast turnaround on shoring equipment hire

Flexible hire terms

Short notice delivery and pick up

Realistic approach to shoring equipment damage

Proud to be working with

Brochure

Pro Shore was founded in 2007 as a realistic alternative to using larger national companies. We provide excavation support safety equipment throughout Northern England. We can and have supplied further afield when required.

brochure
req-bg

Download the below Design Request Form, complete the form and return it to us here at Pro Shore

If you need assistance with this process, please contact us and speak to one of the regional sales managers.

Testimonials

If you need assistance with this process, please Fill the form or
Contact us

    Or Call: 0845 003 8984

    Latest News

    November 8, 2023
    See here a third-party article written about Pro Shore and how we stand out amongst our competitors within the shoring industry.
    February 7, 2023
    Here's a recent scheme we have had the pleasure of supplying, for a valued customer in 2023.
    December 1, 2022
    Here’s a quick look at our Proshore i600 hydraulic frames being utilised for a tank installation in Liverpool Docks alongside 7m L605 sheet piles to assure no water ingress within the workspace.
    November 25, 2022
    The AWARD WINNING Pipe Pusher was developed to ensure Safer Jointing of a pipeline during installation but also has the added benefit of making it Quicker and Easier too.
    February 2, 2022
    Here's a new scheme in Southport for a large culvert installation to kick off 2022.
    August 22, 2019
    With future expansion plans, re-investment is key to Pro-Shore’s growth ambitions. We are continually investing in...