Liverpool Docks – Temporary Works

Here’s a quick look at our Proshore i600 hydraulic frames being utilised for a tank installation in Liverpool Docks alongside 7m L605 sheet piles to assure no water ingress within the workspace.

Award Winning Pipe Pusher

The AWARD WINNING Pipe Pusher was developed to ensure Safer Jointing of a pipeline during installation but also has the added benefit of making it Quicker and Easier too.

Key features of the Stanton Precast Pipe Pushers include:

  • Eliminates manual handling of heavy timber buffers
  • Reduces risk of accidents
  • Reduces time in trench
  • Easy quick hitch system
  • Faster installation
  • Tighter and more controllable joint gaps
  • Can use the full force of the excavator without fear of something breaking or being damaged.
  • Applies jointing load just where it is needed (around the springing level point)